Signature Fargo Concrete CompanySignature Fargo Concrete Company

Concrete parking lot building in Fargo ND - pavement sized for what parks on it

Old lot cracking and holding water, or bare ground that needs paving? We build concrete pavement made for your traffic and Fargo winters.

Get an estimate for your parking lot

We check the ground, where the water runs and what'll park there.

What goes into building a concrete parking lot in Fargo?

Concrete parking lot building in Fargo starts with getting the ground under the lot even all the way across. Then we place concrete thick enough for the cars and trucks that will park there, so the pavement stays flat and drains through years of winters.

Most calls start one of two ways. Either an old lot is breaking up and holding water, or there's a gravel or dirt area that needs real pavement. The price mostly comes down to the size of the lot, how thick it has to be for what parks on it, how much ground needs digging out and replacing, and whether an old lot has to come out first. The schedule turns on the weather and, on larger sites, on the engineering and city paperwork. I walk the site with you and put the scope in writing, and that's where your own figure comes from.

How we handle concrete parking lot building

We start by sizing the pavement to what'll actually park on it, because a lot for cars and a lot that takes delivery trucks aren't built the same. Our crew digs out and checks the subgrade, the soil the pavement sits on, and replaces soft or uneven patches with material like the rest, so the slab sits on the same ground all the way across. We set the grade so water runs off the lot and away from the building. Before the pour I confirm the mix is air-entrained, made with tiny bubbles that give freezing water room to expand, because a lot here freezes and thaws all winter. After the pour we lay a broom finish, a light scratched texture that gives tires and shoes grip, and cut control joints, straight grooves that tell the concrete where to crack. Then it cures, the slow hardening it needs before traffic. If the budget gets tight, I'll cut from the finish before the base. Nobody sees the base on day one, but it decides whether the lot is still flat years from now.

Most lots come with other work around them. Light poles, sign posts and small structures sit on concrete footings, and we set those before the pavement goes in around them. If the building the lot serves has settled at a corner, foundation raising brings it back up, and that's best done before we pave tight to the walls.

Concrete parking lot building in Fargo: stormwater and permits

In Fargo, the size of the site decides a lot of the paperwork. Under the city's stormwater policy, developing or redeveloping a site of one acre or more, or one that's part of a larger development of that size, needs a stormwater management plan prepared by a Professional Engineer registered in North Dakota. The policy also calls for water quality treatment on those sites and on existing parking lots as it lays out. That plan shapes where the water goes, and so where the lot can sit. That's why on bigger sites we bring the engineer and the paperwork in early, so the layout isn't held up. On every job we check with the city what it needs, and when a permit's required, we handle the application and set up the inspections with you.

We're based in Fargo and work across the cities around it. On older lots, what we see most is standing water in low spots, and the concrete around those spots breaks up first after a few winters. So we check where the water runs before we price anything, and we see the same thing on lots in West Fargo and Moorhead.

Why call us for a lot

  • I write every estimate myself

    I come out to look at each job and write the estimate, and our crew lead runs the work on site while I check in. You're never handed to someone who hasn't seen the lot.

  • A licensed contractor on your lot

    We're licensed and fully insured. North Dakota requires a licensed contractor on any job over $4,000, so ask anyone you're comparing for theirs.

  • Planned tight since 2017

    I ran the schedule for a busy building company before I learned to place and finish concrete, and we've run our own jobs on a tight plan since 2017. If the weather turns, I'll move a pour rather than rush it, because concrete doesn't forgive a bad day.

Phone
(701) 608-1202
Hours
Mon–Fri: 8 AM–10 PM, Sat–Sun: 7 AM–9 PM
Location
Fargo, ND 58102

What matters most on a lot is a plan that holds from the first visit to the last pour. Send us the lot size, what'll park there and whether it's new or a replacement through our contact page, or call (701) 608-1202.

Get a written estimate for your parking lot

We respond within 1 business day to set up a time for me to come out. The estimate is free, done at your property and comes with no obligation, and you get the scope in writing. It helps to have the lot size, the vehicles you expect and whether it's new or replacing an old lot ready.

Location
Fargo, ND 58102
Hours
Mon–Fri: 8 AM–10 PM, Sat–Sun: 7 AM–9 PM
Credentials
Licensed and fully insured.

Frequently asked questions

How much does a concrete parking lot cost in Fargo?

There's no set price for a concrete parking lot, because size, thickness and ground work change it on every site. Tearing out an old lot, replacing soft ground and going thicker for trucks all raise the cost, and a level site that only takes cars keeps it lower. Call (701) 608-1202 and I'll come out and price yours.

How thick should a concrete parking lot be?

For cars and pickup trucks only, 4-inch concrete without steel in it is usually enough, while heavier commercial or industrial traffic may need 5 or 6 inches. If you expect light trucks on the lot, plan and budget for the thicker pavement from the start, and let the lot's design settle the final number.

How long does a concrete parking lot last?

Concrete parking lots typically last 30 years or more, according to a 2008 industry guide. That long life makes concrete a good fit if you plan to keep and use the property for decades.

Does my parking lot project need a state construction permit in North Dakota?

It does if the project disturbs one acre or more, because North Dakota's Department of Environmental Quality applies its construction general permit to those projects. That includes smaller projects that are part of a larger development, so I look at the whole site at the estimate and tell you where yours stands.

How do I protect a concrete parking lot from road salt?

Start with the concrete itself, since a research review found it resists salt scaling better with a lower water-to-cement ratio, enough air in the mix, and good finishing and curing. After that, keep the joint seals in good shape, because a working seal keeps most salty water out of the joints and a damaged one lets it soak the concrete around them. New concrete also holds up better if it gets time to air-dry before its first salt, so if your lot goes in late in the season, ask us how we'll plan for that winter.

How wide can a commercial driveway into a parking lot be in Fargo?

The City of Fargo caps commercial and industrial driveways at 40 feet wide, and each one has to lead to parking inside the property it serves. We lay out the entrances to that rule before the pour, so nothing has to be cut back later.

  • Concrete footings

    Light poles, sign posts and small buildings on a lot need solid footings under them, set in place before the pavement is poured around them.

  • Foundation raising

    If the building your lot serves has a corner or slab that's sunk, raising it first lets the new pavement meet it level at the doors.

(701) 608-1202Request an estimate